You are here: Home Projects Completed Trager Center Fieldhouse

Trager Center Fieldhouse

by r0stew03 last modified May 27, 2008 12:07 PM

Architect: Odell Associates

Design Build Contractor:  Abel Construction

Engineering Consultant

Completed:  December 2005

Cost:  $8,090,000

Area:  90,068 sq. ft.

Description:  The Trager Center Fieldhouse is comprised of an 85,440 square foot main building with an adjacent 5,168 square foot support building.  The main facility consists of a pre-engineered metal building structure accommodating a 120-yard full length FieldTurf football field, a four-lane sprint track, a long jump pit, a pole-vault area, and batting cages.  Intended primarily for football, the building can accommodate numerous other sports, including track and field, baseball, softball, soccer, lacrosse, and field hockey. The support building accommodates receiving and storage, maintenance/utility space, restrooms, and office space.

 2006 - Ohio Valley Design Build Chapter Merit Award

Trager Center Exterior       Trager Center Football Field   
 
Trager Center Football Field
    
 
      
Document Actions
Personal tools