Request for Estimates

Due to staffing issues, assistance from vendors may be used to perform the services for this request. This will result in an increase to the cost of this work. Please request estimate if cost is required.

Date of Request  
//   :
Please note we will proceed with the estimate upon approval from the Departmental VP/Dean.

We have been asked that the Deans and VPs are made aware of requests for renovations and enhancements from their departments, and gain their approval before proceeding. This would typically include:

  • Alterations, improvement, renovation, remodeling or demolition of existing facilities.
  • Changes or upgrades in utility systems: air conditioning, heating, electrical, plumbing, air, gas,etc.
  • Equipment installation requiring utilities connections or other requirements, such as additional cooling, new electrical service, etc.
  • Enhancements to interior finishes and appointments, floor coverings, window coverings and furnishings.
  • Facility design, program development, feasibility studies or cost estimates involving remodeling and construction.