Physical Plant Employees Training

Training NameWhenUpdateTriggerTrainer
Asbestos AwarenessAt the time of hire, or first assignmentAnnuallyWorking around potentially asbestos containing materialsPhysical Plant Manager of Staff Development
Building Emergency Plan ReviewAt the time of hire, or first assignment to a buildingAnnuallyAll building occupants must be trainedBuilding Emergency Coordinator
Bloodborne PathogensAt the time of hire, or first assignmentAnnuallyPotential exposure to human blood, body fluids, tissuesPhysical Plant Manager of Staff Development
Confined Space EntryAt the time of hire, or first assignmentTo maintain competencyEntry into permit-required confined spacesPhysical Plant Manager of Staff Development
Electrical Safety & Arc FlashAt the time of hire, or first assignmentAnnuallyElectrical work at 50 volts or higherOutside Trainer
Forklift OperatorAt the time of hire, or first assignmentTo maintain competencyOperation of powered industrial trucksPhysical Plant Manager of Staff Development
Hazard CommunicationAt the time of hire, or first assignmentEvery 3 YearsUse of potentially hazardous chemicalsPhysical Plant Manager of Staff Development
Hazardous WasteAt the time of hire, or first assignmentEvery 3 YearsForemen of trades generating hazardous wasteDEHS Hazardous Waste Coordinator
Hearing ConservationAt the time of hire, or first assignmentAnnuallyNose exposure at or above 85 dBA TWAPhysical Plant Manager of Staff Development
Infectious Waste Collection for Custodial WorkersAt the time of hire, or first assignmentAnnuallyTransporting boxes of "Red Bag" wasteHSC Custodial Office/Supervisor
Infectious Waste Collection for SupervisorsAt the time of hire, or first assignmentAnnuallyAll Custodial SupervisorsDEHS Hazardous Waste Coordinator
Lock-out / Tag-out of Energy SourcesAt the time of hire, or first assignmentTo maintain competencyWorking on de-energized equipmentPhysical Plant Manager of Staff Development
Powered Platforms / Fall ProtectionAt the time of hire, or first assignmentAnnuallyElevated work or use of powered work platformsOutside Trainer
Radiation Safety Orientation for Physical PlantAt the time of hire, or first assignmentAnnuallyAll HSC and Belknap Physical Plant workersDEHS
Respiratory Protection: Required UsePrior to required use of respirators (including N-95's)AnnuallyRequired use of respiratorsDEHS
Respiratory Protection: Voluntary Use (PDF)Prior to voluntary use of respirators (including N-95's)One Time OnlyVoluntary use of respiratorsOSHA Information Sheet
Spill Prevention, Control and Countermeasures PlanAt the time of hire, or first assignmentAnnuallyHandling or managing oil, responding to oil spillsPhysical Plant Manger of Staff Development

Department of Environmental Health And Safety

Main Office

1800 Arthur Street

Louisville, Kentucky 40208

Phone

tel (502) 852-6670

fax (502) 852-0880

Department of Environmental Health And Safety

Radiation Safety Office

319 Abraham Flexner Way

Louisville, Kentucky 40202

Phone

tel (502) 852-5231

fax (502) 852-8911

Office Hours

M-F 8:00 am to 4:30 pm

No holiday hours

IH Service Account

dehsih@louisville.edu

IBC Service Account

biosafe@louisville.edu